Novartis Vaccines – Pipe Bridge
The design, manufacture and installation of a complicated pipe bridge spanning 240ft.
Project details
A successful project following a 12 week plan of works from design phase through to site installation. After conducting a full site survey general arrangement and detailed fabrication drawings were produced for the approval of the client.
The pipe bridge was then manufactured in modular form at our premises and delivered to site in sections, with the columns already in place the frame was lifted in by crane and bolted together.This enabled the client to have minimal disruption onsite and also accelerated the installation time, the design, manufacture and installation was finished ahead of schedule and within budget.